The challenge
Settlement files and transaction lists used different columns. Equal-value payments on the same day were easy to confuse. At month end, reviewers reconstructed correction histories from team messages.
Design decisions
Match multiple fields
The system checks reference, amount and date window. A matching amount alone cannot close an entry.
Create an exception desk
The two source records appear side by side. The reviewer chooses a reason, adds a note and records the evidence checked.
Lock the final decision
Accepting a correction records the time and approver role so the reconciliation can be replayed.
Simulation results
- Before, per item
- 12 min
- After, per item
- 4 min
- Monthly volume
- 300 transactions
- Time released
- 40 hours
300 × (12 − 4) ÷ 60 = 40 hours/month
At equal volume, handling time per item falls by about 67%. This calculation uses one month of fictional data. The team can use the released time for other work.
What gets handed over
Column map, matching rules, exception desk and closing export.


