Skip to content
Manroot

Measurement

Measure work before automating it

Separate hands-on time, waiting time and time spent correcting errors.

A tablet on an orange stand displays report figures and charts.

Agree on start and finish

For a report, finished might mean files received, figures matched or manager approval. Choose one observable boundary and keep it throughout. Two people starting timers at different events produce a comparison that is hard to use.

Record rework

Separate checking minutes from time waiting on a branch. If a source changes after submission, record correction time too. Put the sample count and time range beside the average so an unusually busy day is visible.

Compare equal volumes

If 16 reports take 90 minutes each and the pilot takes 30, the difference is 16 × 60 minutes. Report 16 hours of capacity at that volume. Connect it to cash only when an actual overtime or invoice change is visible.

Keep reading

Made byTata Kelola Digital